As part of the development of the EchoBolt technology repeat inspections of bolted tower connections were carried out for ORE Catapult on their Levenmouth Demonstration Turbine.

​

Average preloads measured were within 4% of the installation targets for the tower connections with all bolts well above the minimum preload threshold eliminating the requirement to retighten the tower joints.

Chris Hill, Operational Performance Director, ORE Catapult

​

“EchoBolt is set to reduce the need for manual work in a crucial operational area, bringing huge safety and cost benefits.”

​